SWPPP Services in El Paso
Are you searching for a trusted Stormwater Pollution Prevention Plan (SWPPP) provider in El Paso, TX?
Our specialized SWPPP services are designed to help you comply with the Texas Commission on Environmental Quality (TCEQ) regulations.
Safeguarding El Paso's water quality is crucial, as pollutants such as dust, debris, and sediment can contaminate local water bodies and upset the delicate ecological balance.
Our El Paso-based SWPPP services are tailored to meet the complex requirements set by TCEQ for construction projects, transportation departments, and sediment control companies operating within the city.
Don't risk non-compliance; submit your plan today and benefit from our expert SWPPP solutions crafted specifically for El Paso's unique needs.
What We offer
Preparing SWPPP:
$525 (from site plans)
Send us your site plans and we will compose a Storm Water Pollution Prevention Plan (SWPPP) specific to your construction activities. These guidelines and management practices will closely adhere to the TCEQ’s suggested storm water pollution prevention guidelines.
Notice of Intent (NOI):
$400 (permit fee included)
Once a Stormwater Pollution Prevention Plan is in place, we will submit the necessary documents and forms on your behalf to the Texas Commission of Environmental Quality (TCEQ) to secure a Notice of Intent (NOI) permit for your development site. This fee includes the state assessed permit fees for the NOI.
Notice of Change (NOC): priced upon request
Notice of Change must be submitted when changed site plans increase the amount of acreage to be disturbed (less disturbance does not need to be submitted) or the area disturbed, a change in operator occurs, or other information originally provided in the NOI has changed.
Notice of Termination (NOT):
$25 with NOI preparations
At the conclusion of your development project, a Notice of Termination must be filed with TCEQ to terminate your permit/NOI for the development site and clear all TCEQ permits. We’d be happy in assisting you with closing your permits. The above price is listed per location, with original NOI submission.